H1 Freeway closed overnight for panel installation

Wake Up 2day

Four lanes will be closed on the westbound side – between the Ka’amilo Street overpass and the H-1/H-2 split from 8 p.m. to 3 a.m.

Up to three lanes will be closed on the eastbound side.Between the H-1/H-2 split – and the Aiea Heights Drive overpass from 6:30 p.m. to 4 a.m.

The reason is so crews can do precast panel work.

Copyright 2019 Nexstar Broadcasting, Inc. All rights reserved. This material may not be published, broadcast, rewritten, or redistributed.